AEG was the CM on this project located at M-2, M-4, M-5 and M-8 Maintenance Facilities. The scope of work included:
Removal and replacement of existing gas and water piping, vent draft ductwork, electric power feeds and existing boilers, and associated controls using LonWorks to communicate with existing building management system.