AEG was responsible for the engineering design and preparation of Phase II Final Drainage Plans, Specifications and Estimates. This project involved the widening, storm sewer design and signalization of the intersection of IL 173 and Tiffany Road in Antioch, Illinois.
Client: Millennia Professional Services (MPS)/Illinois Department of Transportation (IDOT)
Services: Phase II Engineering