AEG provided design services for the hydraulic improvements required for the removal and replacement of the bridge superstructure and repairs of the substructure with vertical clearance improvements. AEG prepared a 404 Permit Application and engineering design and plan, preparation for bridge drainage and utilities, soil erosion control and detailed floodway cut impact exhibits.
Client: Millennia Professional Services (MPS)/Illinois Department of Transportation (IDOT)
Services: Phase II Engineering