AEG was the CM on this project located at the Maintenance Facility M-2, near Cermak Toll Plaza (Plaza 35). The scope of work included:
• Procurement and installation of a permanent Truck Scale including concrete foundations, approach, ramps and truck scale deck.
• Booth relocation from M-6 to M-2 and modification of booth to install Truck Scale equipment.
• Fiber Optic Cable installation from Booth to Plaza 35, Conduit and Unit Duct Installation from Booth to M-2.

Leave a Reply