RR-13-5664 – ISTHA 2015 Systemwide Design Upon Request

AEG served on a Team providing professional design services for the Phase II design and construction contract package for the ISTHA 2015 Systemwide Design Upon Request (DUR) project. AEG’s key responsibilities included the preparation of construction staging plans, contract packaging, construction access and other corridor-wide issues to ensure all project stakeholders concerns were addressed. AEG coordinated existing utility information with the Tollway’s Designated Utility Coordinator, with a bi-weekly utility log as an on-going coordination with utility agencies.

AEG prepared construction staging plans for construction / maintenance operations on various bridge structures throughout the Tollway System on I-88, I-355 and various ramps.

Services also included coordination with outside agencies including IDOT and DuPage County DOT, Cook County Department of Transportation and Highways and various local municipalities.

Clients:                   ABNA/Illinois State Toll Highway Authority (ISHTA)

Services:                 Phase II Engineering (MOT Plans, Agency Coordination)

Leave a Reply