AEG was the CM on this project located throughout the Chicagoland area. The scope of work included:
- Addition and replacement of various widths and types of pavement marking lines, letters, and symbols at various locations on the Tollway System.
- Installation of multi-polymer and polyurea pavement markings.
- Installation of raised reflective pavement markers (RPM’s).