AEG provided professional design services for the removal and replacement of the existing double-barrel concrete box culvert with two 10-ft by 6-ft barrels. AEG developed the hydraulic design for the Drainage and Utilities contract plan sheets, specifications and estimate of cost for final contract plans submittals.
Client: Millennia Professional Services (MPS)/Illinois Department of Transportation (IDOT)
Services: Phase II Engineering