AEG served on the engineering design team providing the Phase II Final contract document preparation and design support for a 3.5ac-ft stormwater management facility in the Northbrook East Subdivision.
AEG provided the engineering design involving the relocation of an existing bike path, storm sewer improvements and restoration, hydraulic and hydrologic design, evaluation of existing outlets consisting of a receiving ditch and storm sewer system, preparation of contract drawings (including QA/QC), review of required permitting (IEPA NPDES, MWRD, CCHD) and construction inspection services for the construction of a stormwater management facility and related infrastructure improvements in the Village of Northbrook.
Client: Village of Northbrook/Patrick Engineering, Inc.
Services: Stormwater Facility Phase II Design